Trial, Inspection & Handover
Mold Trial & Production Validation
Every Mold is Validated Before Delivery
A mold is ready only when it consistently produces components that meet dimensional, cosmetic, and functional requirements.
Before handover, every mold undergoes structured trial runs, process optimization and quality validation to confirm production readiness and ensure reliable performance in your manufacturing environment.
What Happens During This Stage
Every stage is documented to ensure complete traceability and confidence before production begins.
Our validation process includes:
- Trial injection
- Process optimisation
- Visual inspection
- Dimensional inspection
- First Article Inspection (FAI)
- Customer review
- Final corrections (if required)
- Tool buy-off
- Documentation compilation
- Delivery
What You Receive
When your mold is delivered, it is accompanied by the documentation required to support production from day one.
This includes:
- Trial reports
- First Article Inspection records
- Dimensional inspection reports
- Quality documentation
- Process parameters
- Tooling records
The result is a production-ready mold supported by complete documentation, giving your team confidence from installation through long-term manufacturing.